{"id":103,"date":"2022-06-07T14:01:00","date_gmt":"2022-06-07T14:01:00","guid":{"rendered":"https:\/\/webtestinglink.net\/sunteck\/blog\/?p=103"},"modified":"2023-03-22T16:47:03","modified_gmt":"2023-03-22T16:47:03","slug":"vasai-infrastructure","status":"publish","type":"post","link":"https:\/\/www.sunteckindia.com\/blog\/vasai-infrastructure\/","title":{"rendered":"Vasai Infrastructure"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Vasai geared for robust infrastructural development<\/h2>\n\n\n\n<p>Since the 1980s, Vasai has been known for being a densely populated, beautiful and ever evolving suburb of Mumbai. The Vasai-Virar region occupies the north-west corner of the Mumbai Metropolitan Region (MMR).&nbsp;<strong>Identified as one of the 8 satellite cities by the Government of India, a whopping USD 56.3 million has been sanctioned under the Urban Infrastructure Development Scheme in Satellite Towns for its multi-pronged development in the years to come.<\/strong><\/p>\n\n\n\n<p>The Government of Maharashtra has plans to connect the entire MMR by a 337-kilometer Ring Road Project, covering many large infrastructure initiatives like Bandra-Sewri Elevated Road, Mumbai-Trans Harbour Link, Coastal Road, Alibaug-Virar Multimodal Corridor and the Bhayandar-Vasai Bridge.<strong>&nbsp;It has announced it will build the 43-km extension to the Versova-Bandra Sea Link till Virar, cutting down the commute time from Mumbai to Vasai significantly.<\/strong>This will augur well logistically and enable businesses in and around Vasai to prosper further. The Maharashtra State Road Development Corporation (MSRDC) will review the Versova-Virar project that is estimated to cost around \u20b9 32,000 crores. The project will offer faster connectivity to Vasai-Virar regions and areas up to Dahanu.<\/p>\n\n\n\n<p>The Ministry of Urban Development has taken Vasai-Virar under the Urban Infrastructure Development Scheme for Satellite towns, making it the only city from Maharashtra. The proximity of the Delhi-Mumbai Industrial Corridor alignment will further benefit Vasai in terms of industrial activities. The proposal to extend the Mumbai Metro Line 9 from Dahisar-Mira-Bhayandar to Virar is also under assessment. The Mumbai-Ahmedabad Bullet Train is likely to have a stoppage at Virar. A proposal to increase the existing rail lines with additional 8 stations for improved connectivity with Panvel via Diva is also underway.<\/p>\n\n\n\n<p>Since its inception in 2012, the Vasai Virar Municipal Corporation (VVMC) has been very instrumental in its rapid development.<strong>&nbsp;All internal roads are being converted into four-lane roads namely &#8211; Virar to Arnala, Nalasopara to Kalam and Vasai Highway to Vasai Fort<\/strong>. This would ensure smoother transport for the residents of Vasai.<\/p>\n\n\n\n<p>Courtesy of its growth prospects and ever-growing periphery, Vasai is poised to be home to both affordable and luxurious housing projects. Moreover, with various infrastructure projects enhancing its connectivity will boost its real estate prospects remarkably.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vasai geared for robust infrastructural development Since the 1980s, Vasai has been known for being [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":132,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-103","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-residential"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/posts\/103","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/comments?post=103"}],"version-history":[{"count":2,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/posts\/103\/revisions"}],"predecessor-version":[{"id":133,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/posts\/103\/revisions\/133"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/media\/132"}],"wp:attachment":[{"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/media?parent=103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/categories?post=103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sunteckindia.com\/blog\/wp-json\/wp\/v2\/tags?post=103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}